Cable bridges
Ideal for events and construction sites.
Without building permit
The cable bridges of ZGS
- For safely guiding cables or supply lines across the street
- Can be set up by 2 people - The cable is placed on the lattice support and the cable guide and then fixed
- The ballasting is done with concrete blocks
- The masts can be removed for transport Simply remove the holder
Important NOTE!
Delivery takes place with trucks of 40 tons. The access to the unloading point must be suitable for this vehicle and a suitable device (forklift or wheel loader with fork) must be provided on site.

Possible uses
For example as a mobile construction road

Construction & access routes

Concerts &
Events

Wind power &
plant construction

Heavy load &
transport

Crane set-up area

Line construction