Cable bridges

Ideal for events and construction sites.

Without building permit

The cable bridges of ZGS 

- For safely guiding cables or supply lines across the street

- Can be set up by 2 people - The cable is placed on the lattice support and the cable guide and then fixed

- The ballasting is done with concrete blocks

- The masts can be removed for transport Simply remove the holder

Important NOTE!

Delivery takes place with trucks of 40 tons. The access to the unloading point must be suitable for this vehicle and a suitable device (forklift or wheel loader with fork) must be provided on site.

Technische Daten Kabelbrücken

Possible uses

For example as a mobile construction road

Icon Straßenbau & Zufahrtswege

Construction &
access routes

Icon Konzerte & Events

Concerts &
Events

Windkraft- & Anlagenbau

Wind power &
plant construction

Schwerlast & Transport

Heavy load &
transport

Kranstellflächen

Crane set-up area

Leitungsbau

Line construction

Get in touch

ZGS Mobile Strassen
FOMACON Gruppe
Mörsenbroicher Weg 191
D-40470 Düsseldorf

Freecall: 0800 11 00 77 5
E-Mail: info@zgs.ag

Certificates


International

Weltkarte